📱 Best experienced on desktop — mobile view coming soon.
0.0 kW
How much ReVolt does your job need?
Build your equipment list, set your event timeline, and get an instant unit recommendation — sized for your exact load.
Step 01
What are you powering?
Select your equipment below. Adjust quantities with +/− and set the expected load level for dimmable items using the slider. Don't see your equipment? Add it at the bottom.
⌕
Wattage notice: Catalog wattages are based on manufacturer specs and verified sources. Items marked ~est. use industry average values. Confirm specifications with your equipment supplier.
Loading catalog…
Equipment NameWattsQty
—
—
Step 02
How long is your job?
Set your event dates and daily operating hours. This determines total energy needed and whether a Canavan recharge truck is recommended.
Event Dates
Start Date
End Date
Set your event dates above. Use the slider to set your daily operational hours.
Hours of Operation Per Day
8 hrs/day
1 hr24 hr
Step 03
Recommended Units
Your best-match configuration, scored by utilization efficiency. Use the arrows to cycle through alternative options.
Add equipment above to see your recommendation.
⚡
Large Deployment
Submit your quote and a sales team member will reach out to help configure your package.
0
WeVolt units
+
0
Mule units
—
⚡ Canavan recharge support recommended
—
—
Live Power Estimate
Updates as you add equipment and adjust load levels above.
0.0 kW
≈ 0 kWh over 8 hrs
Your Selection
Equipment Summary
Everything you've selected in one view. Adjust quantities and load levels here — changes sync back to the catalog above.
No equipment selected yet. Browse the catalog above to get started.
Ready to Book?
Submit your configuration and our team will build a custom quote — fast.